Introduction
A high Request for Information (RFI) count doesn’t automatically mean bad design. Construction projects are complex, and some RFIs are inevitable. Clarifications are often necessary as drawings develop, site conditions become clearer, and design decisions move forward.
But there is a difference between an RFI that resolves a genuine site query and one that exposes missing information, conflicting drawings or a coordination issue that should have been identified before construction began.
For developers, main contractors, subcontractors and quantity surveyors, the distinction matters. Repeated clarification requests can affect programme certainty, procurement, construction estimating and ultimately project costs.
The question isn’t simply how many RFIs does a project have? It’s why are those RFIs being raised, and could the underlying issues have been identified earlier?
What Does a High RFI Count Actually Tell You?
RFIs are a normal part of construction. A project with a high RFI count may have a complex scope, an evolving design or a team that is actively resolving uncertainties rather than making assumptions.
However, recurring RFIs around the same issues can point to weaknesses in the preconstruction process.
Common causes include:
- Incomplete design information: Drawings lack dimensions, specifications or details needed for construction.
- Conflicting drawings: Architectural, structural and MEP drawings do not align.
- Poor BIM coordination: Services clash with structural elements, ceiling zones or other building components.
- Unclear scope boundaries: Contractors and subcontractors interpret inclusions, exclusions or interfaces differently.
- Unresolved design decisions: Critical details remain open when estimating, procurement or construction activities begin.
The issue is not the number of RFIs alone. It is whether the questions reveal uncertainty that could have been reduced through better coordination, information review and preconstruction planning.
1. Design Gaps Can Become Cost and Project Risks
Consider a typical example: an MEP subcontractor discovers that a proposed duct route conflicts with a structural beam.
The subcontractor raises an RFI. The design team reviews the issue, revises the route and issues updated information.
On paper, it is a straightforward clarification. In practice, the answer may affect ductwork fabrication, plantroom layouts, ceiling coordination, material procurement and installation sequencing.
If the issue is identified during BIM coordination, the team may be able to resolve it before fabrication or site installation.
If it is discovered later, the same issue can lead to rework, additional labour, material changes and delays to follow-on trades.
This is why design coordination is more than a drawing exercise. It helps teams identify potential construction problems before they become expensive site problems.
2. Poor Coordination Can Undermine Construction Estimating
Construction estimating is only as reliable as the information behind it.
When drawings contain omissions, conflicting details or unresolved interfaces, estimators must make assumptions. Those assumptions may be reasonable, but they still introduce risk.
For example, an incomplete MEP design may leave uncertainty around the quantity of ductwork, pipework, fittings, supports or associated builder’s work.
A quantity takeoff based on that information may be incomplete or may need to be revised when the design develops.
The consequences can include:
- Underestimated quantities and additional costs.
- Overestimated quantities and less competitive tenders.
- Missed scope items or duplicated allowances.
- Revisions to the BOQ and tender pricing.
- Commercial disagreements over what was included in the original price.
A thorough pre-tender review helps distinguish between measurable scope, provisional allowances and information that still needs clarification.
The objective is not to eliminate every assumption. It is to identify, document and manage assumptions before they affect the tender or construction budget.
3. Why Quantity Takeoff and BOQ Quality Matter
A quantity takeoff translates drawings and specifications into measurable work items. A Bill of Quantities (BOQ) organises that information into a structured basis for pricing and tendering.
When the source information is incomplete or inconsistent, the risk extends beyond the drawing itself.
A missing wall build-up, an unclear specification or an uncoordinated service opening may affect quantities, trade packages and pricing assumptions.
For US projects, Estimating teams typically follow project-specific measurement and estimating standards, using CSI MasterFormat to organise construction specifications and trade scopes. The appropriate measurement and pricing basis should be confirmed against the project documents and tender requirements rather than assumed to be standardised across all US projects.
For UK projects, quantity surveying teams may use RICS New Rules of Measurement 2 (NRM 2) for detailed measurement of building works, depending on the procurement and measurement requirements of the project.
For Irish projects, quantity surveyors work within the relevant project documentation, measurement conventions and tender requirements. The appropriate basis of measurement should always be confirmed rather than assumed to be identical across jurisdictions.
A robust estimating and measurement process should include:
- Reviewing drawings and specifications before measurement.
- Checking revisions and identifying discrepancies.
- Measuring scope consistently against the agreed measurement rules.
- Recording exclusions, assumptions and provisional quantities.
- Highlighting missing information that could materially affect cost.
- Coordinating with relevant disciplines where scope interfaces are unclear.
A BOQ cannot correct a poorly coordinated design by itself. However, a disciplined takeoff and estimating review can expose information gaps before they turn into commercial surprises.
4. BIM Coordination Helps Identify Problems Earlier
Building Information Modelling (BIM) can give project teams a more coordinated view of architectural, structural and building services information.
Effective BIM coordination and clash detection can help identify:
- Ductwork or pipework intersecting structural beams.
- Services competing for limited ceiling or riser space.
- Insufficient access or maintenance clearances.
- Inconsistent openings and penetrations.
- Installation sequencing and spatial coordination issues.
Not every clash is a design error, and not every clash automatically requires an RFI. Some are intentional, some are manageable, and others need a design decision.
The value of BIM coordination lies in identifying the issues that matter, assigning responsibility for resolving them and confirming that the agreed changes are reflected in the relevant models and drawings.
It is equally important to connect coordination findings with construction documentation and estimating. A design change that resolves a clash may also affect quantities, specifications, procurement and cost.
When these activities are reviewed together, teams have a better opportunity to identify both technical and commercial implications before work reaches site.
5. Preconstruction Is Where Many Avoidable Issues Can Be Reduced
Preconstruction provides an opportunity to test whether the available information is sufficiently coordinated and complete for the next project stage.
Rather than waiting for site teams to identify discrepancies, contractors can carry out structured reviews before tender submission, procurement or construction.
Depending on the project, this can include:
Drawing and specification reviews: Identify omissions, conflicting information and unclear scope.
Quantity takeoff and BOQ checks: Highlight incomplete measurement information, inconsistent revisions and potential scope gaps.
MEP takeoff and coordination reviews: Check measurable services scope alongside relevant architectural and structural interfaces.
BIM coordination and clash detection: Identify spatial conflicts and track the resolution of significant coordination issues.
Tender clarification support: Prepare focused questions that help the design team and client resolve material uncertainties.
Cost impact reviews: Assess how proposed design changes may affect quantities, trade packages and estimated costs.
These activities do not remove the need for RFIs. Instead, they help teams raise better questions earlier and reduce the likelihood of avoidable issues surfacing at the most disruptive stage of a project.
6. What Should Contractors Look for Beyond the RFI Count?
A raw RFI total rarely tells the full story. Contractors and project managers should look at the patterns behind the numbers.
Useful questions include:
- How many RFIs relate to missing or conflicting design information?
- Are the same issues recurring across different trades or drawing packages?
- How many RFIs affect procurement, fabrication or site installation?
- Are responses leading to design revisions or changes in scope?
- Could particular issues have been identified during an earlier drawing or BIM review?
- Are unresolved questions affecting tender assumptions or cost certainty?
It can also help to classify RFIs by cause, discipline, project stage and commercial or programme impact.
This creates a more meaningful picture of where the process is breaking down. It also helps teams focus improvement efforts on recurring issues instead of treating every clarification as evidence of poor performance.
How Precon Supports Better Preconstruction Decisions
At Precon, we support contractors, subcontractors and quantity surveying teams with the technical and commercial work that helps them prepare for delivery.
Our services include construction estimating, quantity takeoffs, BOQ preparation, BIM coordination, MEP takeoffs, CAD and Revit modelling, and construction documentation support.
For UK and Irish projects, our teams can support measurement and estimating workflows aligned with the agreed project requirements, including relevant RICS NRM2-based measurement where applicable.
The aim is to help project teams work with clearer quantities, better-coordinated information and a more transparent view of outstanding scope questions.
Whether a team needs additional estimating capacity during a busy tender period or dedicated BIM and measurement support across multiple projects, the right preconstruction resources can help identify uncertainties earlier and keep commercial decisions grounded in the available information.
Final Thoughts: Don’t Just Count RFIs. Understand Them.
A high RFI count does not automatically mean a design is poor. Complex projects will always require clarification, and RFIs remain an important part of managing construction information.
The greater concern is a recurring pattern of questions caused by preventable gaps, conflicting drawings, incomplete scope information or unresolved coordination issues.
These patterns can affect estimating accuracy, BOQ completeness, procurement decisions and construction delivery.
The opportunity lies in addressing those issues earlier through disciplined drawing reviews, coordinated BIM workflows, reliable quantity takeoffs and clear tender assumptions.
The goal isn’t zero RFIs. It’s fewer avoidable RFIs, better-informed commercial decisions and fewer surprises once construction begins.