If you’ve worked on mixed-use schemes, you’ll recognise this straight away. Designs were evolving, and every small change meant starting measurements again. It wasn’t adding value, it was just eating time.
We worked directly from the BIM model and kept quantities live as the design developed. Instead of re-measuring from scratch, updates became controlled and predictable.
That shift gave the QS team space to focus on what really mattered, advising on cost, risk, and value, rather than chasing drawings.